Healthcare

 

Restful Homes Group

St. Giles Care Home, Birmingham

Project Value: £290,000.00

 

Carter Construction was appointed as the main contractor for the extension and partial refurbishment of an existing care home for the elderly.

The construction involved auger piling and reinforced ground beams, traditional masonry construction with beam and block flooring, traditional roof construction, upvc windows and external doors, integrated M&E services and complete internal finishes.

As well as the usual statutory considerations this project faced some unusual interfaces, including liaison with airways control and construction over a public sewer.

Working in an extremely sensitive, fully operational environment, Carter Construction took maximum precautions to ensure the protection and comfort of all staff, in-patients and general public.

This contract was awarded through a competitive tender, under a Design & Build form of contract. Works were completed on time and within budget, to the

satisfaction of all involved.

Ley Hill Healthcare Centre – Ashley House Plc

Northfields, Birmingham

Project Value: £930,000.00

 

Project: New Doctors Surgery and PCT Unit, Ley Hill,

Northfield, Birmingham

 

Working on behalf of Ashley House Plc, Carter

Construction was appointed as the Main Contractor

for the construction of a new Doctor’s Surgery and

PCT Unit.

 

The construction incorporated the management of

very difficult existing site conditions, with partial fill on

top of demolished buildings and an imported structural

batter to maintain, to support adjacent road. Foundations

incorporated a combination of driven and drilled CFA

piles, a cast in-situ main structural beam and a 4m high

waterproof concrete retaining wall, to create the site

level step. Main building was then built off a

pre-cast beam system, with beam and block floors,

concrete stairs and traditional masonry and roof

construction. Externally, there was extensive use of

Gabion Basket retaining walls, and an 80m3

Stormwater attenuation tank and Hydrobrake.

Internally – under-floor heating throughout, to

ensure optimum performance.

Langton Grange Medical Centre and adjacent Pharmacy– Healthtrak UK

Lichfield, Staffordshire

Project Value: £1.7m

 

Project: New Medical Centre and Pharmacy, Eastern

Avenue, Litchfield

 

Working on behalf of Healthtrak UK, Carter Construction

was appointed as the Principal Contractor for the

construction of a new Medical Centre and Pharmacy.

 

The project contained two phases. Phase one was the

construction of a new Medical Centre, on a ‘green field’

site in Lichfield. The construction works incorporated an

initial cut and fill exercise, to correct the site levels,

oversize foundations to overcome ground conditions,

and then a structural ground floor slab. 1st floor formed

from Acast Permanent concrete formwork and structural

in-situ slab, with a complex 2-storey steel frame forming

an unusual wing roof. Internally, the Centre was divided

between the new Doctors Surgery, and the PCT/District

Nurse Centre. External works incorporated a separated

drainage system, with pumped stormwater solution, into

a main attenuation system.

 

Phase two was the construction of a separate Pharmacy

Building, with extended car-park. The construction work

incorporated the shell construction of a traditional

masonry building.

Welbeck Road Health Centre – Ashley House Plc

Bolsover, Derbyshire

Project Value: £2m

 

Project: New Medical Centre, Welbeck Road, Bolsover,

Derbyshire

 

Working on behalf of Ashley House Plc, Carter

Construction was appointed as the Main Contractor

for the construction of a new Doctor’s Practice

and Primary Care Centre

 

The construction incorporated the demolition of an

existing health centre, the formation of new approach

road/ public highway and a new two storey health

care centre servicing an eight doctor practice, PCT,

district nursing and minor operations.

 

Masonry construction with special details in façades

and a beam and block first floor. Underfloor heating

throughout, two lifts, air conditioning to select areas,

extensive car parks and overall site landscaping.

The project also included a new approach road

and highway connection, where we incorporated

an adjacent additional client (the Local Authority

with regards to The School) and provided new

roads and child drop off parking areas.

Clifton Road Surgery – Ashley House Plc

Ashbourne, Derbyshire

Project Value: £800,000.00

 

Project: New Doctors Surgery, Clifton Road, Ashbourne,

Derbyshire

 

Working on behalf of Ashley House Plc,

Carter Construction was appointed as the

Main Contractor for the construction of a

new Doctor’s Practice.

 

The construction incorporated specialist site

clearance of contaminated ground, complex

piled foundation with ground beams and a two

store health care centre to accommodate a four

doctor practice, plus PCT. Externally the project

included adapting the existing highway, and

providing additional car parking for the adjacent

leisure centre.