Derby Road
Burton on Trent
Commercial Unit
Carter Construction were contracted to construct
a single building, Triple Commercial Unit, with
steel frame and cladding construction,
shopfront entrances, and including external
works and parking.
The units are serviced with all utilities, for fitting out by Tenants
Working with Aspect Consulting Engineers Ltd as Structural Engineers and EKV Design as the Architect, works were completed in 18 weeks and handed over to Client for Internal fit-out in January 2020.
FC Laser
Stanton Bonna
Bespoke Industrial unit
We’ve completed and handed over FC Laser this took place at the end of January 2018.
A new built bespoke Industrial unit on a reclaimed Brownfield site in Stanton Bonna, adjacent to the M1 near Junction 25.
1850m2, 20,000 ft2 of Unit, with Integral offices, car parking and a lorry yard, and all new utility services.
The project has been a resounding success, completed on time, to budget, and all to the client’s satisfaction.
Handed over to very happy Clients, the facility is now in full use and has increased efficiency for the Business – FC Laser Ltd.
FC Laser MD – Danny Fantom, said “Delighted to take possession of the New facility, and happy to continue to work with Carter Construction…
Well done to Site Manager Phil Bates and all the team at Carter Construction.
NCS Fabrications
Derby
Steel Frame Unit
Carter construction were instructed to Infill a Steel frame unit, to provide manufacturing and processing space, along with Canteen and Staff facilities at NCS Fabrications, Ascot Drive, Derby
Working with Michael Evans & Associates Limited as the Principle Designer & Structural Engineers and Green $ Architects as the Architect.
Works were completed in 16 weeks and handed over to Client for Internal fit-out in April 2019
Star Micronics and Morgan Industrial Properties
Raynesway in Derby
Construction of a new Headquarters, Showroom, Training and Assembly facility for Star Micronics.
Carter Construction Ltd have assisted in the relocation of Star Micronics from their current home in Melbourne, Derbyshire, to a new, front-line, modern facility on Raynesway in Derby. Working with Morgan Industrial Properties as Site Owner and Developer, and in conjunction with Lyall and Lyall – Architects and Designers, and AJS Structural Engineers, we are currently in the Frame and Cladding stage of the works, with fit out to follow.
We also had to overcome extremely difficult ground conditions, and a raised floor level, due to local flood risk issues. Working with Vibro Menard, we installed a ground bearing, dynamic solution of Vibro Stone Piles to support the main building pad foundations, and the floor slab. This allowed a cost-effective and traditional construction solution, without excessive underground costs.
Works Completion – June 2016
Lotan Ltd – Phase 2
Leicester
Extension to original phase 1
Working with the same team of Richard Julian Associates (Project Managers), Stephen George and Partners (Architects), and BSP Consultants (Structural Engineers), Carter Construction provided the new extended facilities to Phase 1. Works were completed in 20 weeks, without disturbing the existing operations onsite – a vital requirement to the business. Connections were made to the existing building, without removing the original gable, and completely finished internally, without removing the connecting internal walls – allowing continuous operation of the Clients manufacturing processes.
NCS – Phase One
Derby
Multi-Stage Construction Project
Part of a multi-stage construction project, Phase One works involved the formation of a small extension to an existing industrial unit. Located on the Ascot Drive Industrial estate in Derby, the project required extensive steel and cladding works, as well as minor repairs to the existing building.
Completed on time, to budget and to complete client satisfaction we are looking forward to begin Phase Two operations in the near future.
Metal Works
Leicester
Remedial Works
Carter Construction was instructed to carry out remedial works to an existing industrial unit in Leicester, after the original contractor failed to meet the terms of their contract. After originally been unsuccessful at tender stage, Carter Construction’s work involved the complete break-out and re-casting of the reinforced concrete slab, the inclusion of additional structural steels and a complete internal fit-out – Including painting and decoration, tiling, plastering and Sanitary-ware.
Specialist contractors were required to install the liquid oxygen distribution pipe work, air compressors and conveyors painting system, with all work overseen by our site manager Phil Bates. All work was completed on time, all to the satisfaction of our client.
Lotan Limited
Leicester
Design and Build of New Industrial Unit
Construction has completed the design and construction of a new industrial unit on the Ashton Business Park in Leicester in the summer of 2013.
Works began in late April and in just 24 weeks, the entire project, including all internal and external work, was fully constructed.
In partnership with BSP Consultants as structural engineers, and Stephen George & Partnership as the architects, the completed product was a 31,000 sq ft, steel portal framed industrial unit, to be used by Lotan Ltd, in Leicester.
Construction involved the used of state of the art, concrete laser levelling systems to form the composite floor and external concrete slab, as well as extensive cladding works, and a complex mechanical and electrical fit out, complete with renewable energy systems.
The project was handed over in 2013, completed on time, to budget, and all to the satisfaction of the client
If you would like to learn more about these projects or are interested in how we can assist you with your own please feel free to contact us on 01332 381601 or make an online enquiry by clicking here